Asbestos cement-based materials that were once commonly used as internal walls and ceiling linings contain around 15% asbestos fibres by weight. If possible, this kind of asbestos cement product should be removed unbroken. If you discover that such material has sustained damage while still in place, it can be reinforced by using duct tape.

Down Pipes Drains and Gutters

Removal procedure

1

Safety First

Safety First

Ensure that all workers are wearing the correct safety respirators and disposable overalls for asbestos removal.

2

To catch debris and protect the floor or scaffolding, spread layered plastic and tape it around the perimeter. Ensure the plastic is not a trip hazard when working on scaffolding

3

Prepare double layered plastic on which to stack your asbestos product.

4

Remove all brackets, screws and bolts that are holding the asbestos product in place and then remove the asbestos product

5

Using a HEPA filtered vacuum cleaner, vacuum the wall and flooring areas where possible. If removal took place on grass or garden all debris must be removed.

Request a free Asbestos Removal Quote today and one of our experts will be in touch.

  • This field is for validation purposes and should be left unchanged.